PROJECT DESCRIPTION
This 3.5 Acre site is situated at the intersection of Marsh Wall and Limeharbour, neighbouring Canary Wharf. The proposed mix-used development is to have 7 buildings ranging 12 storeys to 55 storeys. The site is accessible from at least 3 sides; Marsh Wall, Limeharbour and a rear access from Aste Street. Surrounded by significant landmarks, in proximity to the Canary Wharf development, which has the second highest concentration of high-rise office and residential buildings in London after Central London CBD. In recent years, there’s a growing demand for High-end housing in Canary Wharf. The proposed project is expected to be a vibrant residential based mixed-use project including branded hospitality & flexi-offices.
Key Aspects of Project Activities:
Strategic Planning & Site Optimisation
- Conceptualised a high-density mixed-use scheme on a 3.5-acre freehold site with ~1,000 ft of frontage (Marsh Wall, Limeharbour and a tertiary access from Aste adjacent to Canary Wharf’s high-rise zone.
- Maximised commercial exposure and urban integration through a 7-tower masterplan (12–55 storeys) comprising residential, hospitality, retail, and flexi-office assets.
Product Mix & Commercial Strategy
Developed a commercially driven product mix aligned with market trends:
- Premium residential with skyline views
- Flexi-office / serviced apartments
- Dual-exposure retail & F&B along high-footfall frontages
- Centrally located 4-star branded hotel with shared amenity function
- Planned independent access and servicing for each component to enable targeted branding, standalone functionality, and distinct stakeholder engagement.
Phased Implementation & Progressive Monetisation
Structured the project into two primary phases with optional sub-phasing, enabling:
- Staggered capital expenditure aligned with delivery and market timing
- Early handover and revenue generation from Phase 1 assets
- Rolling monetisation of development through progressive asset delivery
- Flexible entry points for multiple JV stakeholders at various stages
Affordable Housing Strategy
- Integrated 35% affordable housing into distinct, self-accessed blocks, balancing planning compliance with optimisation of premium residential value and branding.
Investor & Operator Participation Framework
Enabled multi-stakeholder involvement through:
- Institutional equity for residential and retail
- Operator-led structures for hotel and flexi-office
- Independent JV models for each asset class and phase
Value Creation & Delivery Assurance
- Positioned the development as a commercially viable, vibrant lifestyle-integrated urban district, rooted in deliverability, phasing discipline, and financial flexibility, establishing Skylines as a future-defining project within the Canary Wharf corridor.
KEY SERVICES
- Development Advisory, Project Management
PROJECT HIGHLIGHTS
3.5 Acres
Project Area
1.5 Million sft.
Gross Area
Staged Construction
Multiple Integrated Contracts
PROJECT GALLERY